Record and correct cleaning hours by site

A simple method to turn field interventions into a clear monthly grid, with accurate hours and explained variances.

Recording hours becomes difficult when managers use several versions of a file or adjust a total without finding the days behind it. A grid for each site and month lets you return to the source: the person, the day and the hours actually worked.

Managers enter and review this information in InspectShift. Workers are not asked to clock their arrival and departure. Use the following recording and checking routine during the month and again before approval.

1. Select the correct site and month

Before editing, read the site name, period and monthly status. Check the expected workers. If someone is missing, have their assignment checked instead of entering their hours on another person’s row.

The monthly status and your permissions determine the available actions. If a period is no longer editable, follow your company’s authorised correction workflow. Do not move an error from an approved month onto a different day just to balance the totals.

2. Enter the hours actually worked

Work through each worker and day using verified information. Distinguish a duration from a time of day: starting at 6 am and finishing at 9 am does not mean entering 9 hours. Also check the format expected by the input field.

A decimal duration is a fraction of an hour, not minutes after the decimal point. For example, 1 hour 30 minutes equals 1.5 hours. Do not copy “1.30” assuming it represents the same duration.

Example: one working day split across two sites
InterventionDurationEquivalent in hours
Site A · morning3 h 30 min3.5 h
Site B · afternoon2 h2 h
Daily total5 h 30 min5.5 h

3. Explain days that need context

An empty cell does not explain why someone did not work. Check whether the day relates to an absence, leave, a public holiday or simply no scheduled intervention. Use absence information to retain that context.

If a pending leave request appears in the grid, have an authorised person handle it. Hours cannot be entered in that cell while the request is pending. Do not work around the record by placing the hours on another day.

4. Review totals and understand variances

Check each worker’s total, then the site total. Compare the latter with the budget for that month. A variance is a reason to investigate rather than automatic proof of an error: a replacement, additional work or an incomplete budget may explain it.

  • Look for repeated or missing hours on individual days.
  • Compare absences with the hours entered.
  • Review work split across several sites.
  • Check the budget reference before concluding that a site is overspending.

5. Prepare approval from a reviewed grid

After a correction, check that it has been saved and review the recalculated totals before leaving the site. Arrange regular checks during the month so that every anomaly does not surface on the final day.

Once days, absences and variances are understood, send the month for review through the available workflow. Prepare exports from that same verified version so that the shared file matches the grid that was checked.

Your checklist before moving on

  • The site, month and status have been checked.
  • Hours match real interventions and the correct duration format.
  • Absences and pending requests are understood.
  • Duplicates and budget variances have been investigated.
  • Saved corrections have been reviewed before handover.